Get help from the best in academic writing.

A line has the operating characteristics listed below. – The line runs 3 shifts

Question: A line has the operating characteristics listed below. – The line runs 3 shifts a day, and the line is expected to operate for ( 7.0 ) hours each shift. – Downtime per day is 34 minutes (note that this is per day, not per shift). – Equipment is designed to run at 160 packages per minute. – 187,700 packages are produced per day, of which 180,000 areShow transcribed image textTranscribed image text: A line has the operating characteristics listed below. – The line runs 3 shifts a day, and the line is expected to operate for 7.0 hours each shift. – Downtime per day is 34 minutes (note that this is per day, not per shift). – Equipment is designed to run at 160 packages per minute. – 187,700 packages are produced per day, of which 180,000 are acceptable. Determine the OEE metrices of the line. If it less than 90% suggest an improvement.

professional writing services near me

error: Content is protected !!